Contact Us
Step-by-Step Guide: How to Properly Load Air Cushion Film into Your LockedAir Air Cushion Machine

Step-by-Step Guide: How to Properly Load Air Cushion Film into Your LockedAir Air Cushion Machine

A high-speed air cushion machine is the heart of a modern packing station. Even advanced systems like the LockedAir® LA-E5P require correct setup to perform at their peak. Incorrect loading of the Air Cushion Film is the primary cause of air leakage, film jamming, and unnecessary downtime.


Follow this professional guide to ensure your system runs smoothly and delivers consistent protection for your products.


Step 1: Preparation and Inspection

Before starting, ensure you have the correct Air Cushion Film specifications for your machine.


Compatibility Check: Verify the film width and core size match your machine’s spindle. Using incompatible film can lead to uneven tension and sealing failures.


Power On: Connect to a stable power source and switch on the device. Most LockedAir machines feature a rapid pre-heating phase to get you started quickly.


Step 2: Mounting the Air Cushion Film Roll

The direction of the roll is critical for a proper seal.


Orientation: Place the Air Cushion Film roll onto the unwind spindle. Ensure the air-entry channel (the perforated side) is facing toward the machine’s air nozzle.


Stability Check: Ensure the roll can rotate freely without excessive friction, which could strain the motor.


step-by-step-guide-how-to-properly-load-air-cushion-film-into-your-lockedair-air-cushion-machine-1.jpg


Step 3: Threading the Film

The threading process is where most errors occur. Follow the illustrated path on your machine’s chassis precisely.


The Guide Rods: Pull the leading edge of the Air Cushion Film and wind it around the top of the film guide bar, then pass it through the tension rollers . This ensures the film remains flat and taut as it enters the heating area.


step-by-step-guide-how-to-properly-load-air-cushion-film-into-your-lockedair-air-cushion-machine-2.jpg


Nozzle Insertion: Locate the air-entry channel on the film and attach it securely to the air inflation nozzle or air tube  .


step-by-step-guide-how-to-properly-load-air-cushion-film-into-your-lockedair-air-cushion-machine-3.jpg


Feeding: Use the "Feed" button to pull the Air Cushion Film into the inlet port  and through the sealing wheels until it reaches the outlet port .


step-by-step-guide-how-to-properly-load-air-cushion-film-into-your-lockedair-air-cushion-machine-4.jpg


Step 4: Testing and Calibration

Never start a full production run without a test.


Initial Run: Press the "Start" button and observe the first 2-3 meters of the inflated Air Cushion Film.


Quality Audit: Check for consistent inflation and a strong, clean seal. If the pillows are under-inflated or the seal is melting, adjust the air volume and temperature settings via the digital control panel.


Watch the Official Tutorial

For a detailed visual walk through of the feeding process for the LA-E4S and other models, watch our comprehensive guide on YouTube:




BJT Pack Group
         Website:https://www.lockedair.com/
         Email: info@lockedair.com


Providing innovative Sustainable Packaging Solutions:
LockedAir Air Cushion System  LockedPaper Paper Cushion System


Leave a Message
Email us with any questions or inquiries or use our contact data. We would be happy to answer your questions.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. Part of the tracking is necessary to ensure SEO effectiveness,
By using this site, you agree to our use of cookies. Visit our cookie policy to learn more.
Reject Accept